Triton Digital runs a series of tests when on-boarding a DSP to ensure the integration works as expected. The tests rely on a set of campaigns that the DSP must set up and run on their end.
Supply and Demand Details
In order for Triton Digital to conduct our functional validation tests, DSPs need to set up two campaigns, "A" and "B," as shown below.
Tests
The grid below shows the arrangement of the functional tests. Note that not all of these functional test are done in all cases.
Functional tests grid
Triton Digital reports back to the DSP when the tests are completed. We might have to run the test several times, if errors occur.